“From start to finish Chemstore handled the project professionally and with great enthusiasm.
Was a pleasure to deal with David who helped us work out the best storage option for the limited space we had. The storage units were received in good condition and installed on time. Look forward to working with Chemstore in the future.”
Pat McGrath
Facilities Utilities Coordinator
Our three separate site visits allowed us to monitor this project very closely ensuring the highest standards were met. This allowed us to design a state of the art 6 IBC unit and 2.5 metre walk in unit. Through this time we worked very closely with the engineering manager to ensure the objectives were reached.