IE 061 327 792

Wind Farm Project a Breeze for Chemstore

The clients requirements

The initial inquiry from SSE came in November of 2016 when the wind-farm project was just at planning stage. There was a requirement for storing lubricants. Also electrical items such as lights and sockets were required. An additional external connection was required to connect to an on site power supply. A full site assessment was carried out to determine the exact storage procedures in place for the hazardous materials.

 

 

“From start to finish Declan was a pleasure to deal with. We had impressive engagement from the design phase to installation and follow up. The finished product is now on site and looks extremely impressive. Also the new Chemstore Connect software is a great idea, we are looking forward to using this software going forward. I would definitely recommend Chemstore to a supplier and I like forward to working with Chemstore again in the future.”

 

Francis McKenna

Windfarm Operations Supervisor

 

 

Our solution

Logistically this proved a challenge but one Chemstore managed seamlessly through close contact with Francis McKenna. Declan our technical engineer planned the successful design, manufacture and delivery to the remote site. One unit is going to be used to store new oil whilst the other is going to be used to store waste oil before collection from site (for the turbines).

Do you have a similar need?
Call us today on
061 327 792 or
Book a site visit